Home additions & ADU
Kitchen remodeling
Bathroom remodeling
Roofing
Windows & doors
Driveway & pavers
FenceFree written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Corte Madera
Corte Madera homeowners come to us when a house has run out of room and moving isn’t the answer. We build home additions and ADUs for this town specifically, with a firm grasp of how its bayside parcels and hillside streets follow different code paths before the first permit is filed. Corte Madera is small and built out, so nearly every project here is an addition or a rebuild on a mid-century home, not new construction on open land. That means the details matter: structural analysis, permit review, flood elevations, fire hardening. Call (877) 367-8617 to schedule a free estimate. We answer 24/7, with fast dispatch from 7am to 7pm, Sunday through Friday.
Why Corte Madera Homeowners Call Construction Richmond for Home Additions & ADU
We handle the whole arc of an addition or ADU under one contractor: design help, permitting, structural work, framing, finishes, and the inspections that close it out. One contractor, every project phase. That matters in a town where a single job can require floodplain documentation on one side of Highway 101 and wildland-urban-interface fire compliance on the other. Getting both right takes a builder who knows the terrain, not a crew driving in from an hour away.
Our technicians have up to 11 years of experience, and we carry relationships with more than 50 recognized national brands across roofing, windows, cabinetry, countertops, and prefab ADU systems. That breadth lets us match the build method to your timeline and budget, whether that’s a full custom addition or a prefabricated unit from Abodu or Dvele. We work to a written, itemized scope so you know what’s included before work begins. Response to Corte Madera is quick, and estimates are always free.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Corte Madera
Whether you need more living space, a home office, or a unit for family or rental income, our home additions & ADU team builds to the standards this town actually enforces. Here are the services Corte Madera homeowners ask for most.
ADU Design & Permitting
Permitting is where most ADU projects succeed or stall in Corte Madera. The Town of Corte Madera planning review is thorough, and your submittal has to reflect the right code path for the parcel: finished-floor elevation on bayside lots, fire-resistant roofing and siding on hillside parcels. We build the design and permit package together so the drawings and the compliance documentation agree before anything is filed.

Garage Conversion ADU
A garage conversion is often the fastest route to a legal ADU on a Corte Madera lot, and it’s a strong fit for the town’s older ranch homes. The work usually means new insulation, utilities brought up to code, and fire separation between the unit and the main house. A typical garage conversion in Corte Madera runs $30,000-$80,000, and the written estimate sets the final price.

New Detached ADU
A detached ADU gives you privacy and separation, but it also triggers the most site work: foundation, drainage, utilities, and the same compliance review as the main house. On Corte Madera’s hillside streets, that means planning for slope and drainage from day one. We work with prefab systems such as Abodu and Dvele alongside full custom builds, which lets us match the construction method to your budget and schedule.

Junior ADU & Interior Conversion
A junior ADU converts existing interior space, like an attached garage or a spare suite, into a smaller self-contained unit. It’s a lower-cost path to added living space and suits Corte Madera’s compact lots well. We handle the layout, the code upgrades, and the permit package, and we coordinate the surrounding remodel if you’re updating other rooms at the same time.
Trusted Brands We Service in Corte Madera
Material choice is a customer right, not an afterthought, and it’s how a Corte Madera addition holds its value. For ADUs we work with prefab systems from Abodu, Dvele, and Cover, matching the build method to your timeline. We also source designer-grade countertops from Cambria, Caesarstone, and Silestone and cabinet lines from KraftMaid and Wellborn, so the finishes inside a new addition feel considered rather than default. You choose the brand, we handle the build. Our supplier relationships mean we can source the right products and turn a project around without the delays that come from hunting down materials mid-build.
Common Home Additions & ADU Problems We See in Corte Madera Homes
Corte Madera’s housing stock is mostly 1940s to 1970s ranch and split-level homes, many still original, and that shapes what goes wrong on an addition. Here’s what we see most.
- Fire documentation missing from a hillside submittal. ADU plans on hillside streets sometimes get approved without wildfire-defensibility documentation, and the fire-resistant roofing and siding aren’t spelled out in the plans. That tends to surface as a failed inspection and a stop-work order mid-framing, right when the schedule can least afford it.
- Finished-floor elevations that miss the FEMA flood requirement. On bayside lots, an addition built with elevations that don’t meet flood-zone rules can force a redesign or a variance after the foundation is already poured. Getting the elevation review done before the pour is the whole point.
- Underbuilt framing on a second story. A 1950s ranch was never engineered for a second story, and a low bid that skips structural engineering can leave you with undersized load-bearing framing and a failed rough-in inspection. The structural analysis comes first, not after.
- Moisture trapped behind walls from poor sequencing. Marin’s wet winters and dry summers mean rough-in and exterior sheathing have to be scheduled around rain, or moisture gets sealed in behind the walls. A builder who plans the weather window avoids the problem entirely.
See the difference
Before
After
Before
After
Before
AfterThe Corte Madera Code Split: Flood Zone vs. Fire Zone
Here’s the thing that makes building in Corte Madera different from most of Marin. The Highway 101 corridor splits the town into two code paths. On the bayside flats, low-lying parcels fall under FEMA flood-zone rules, and finished-floor elevations get scrutinized closely. On the rising hillside streets, the same project runs headlong into wildland-urban-interface fire hardening. Two neighboring houses a few blocks apart can follow entirely different engineering, materials, and inspection requirements. A qualified contractor has to be fluent in both at once.
On a typical Corte Madera addition or ADU, the existing ranch often has a subfloor and framing that were never engineered for a second story or a detached unit. A qualified general contractor first runs a structural analysis to confirm load-bearing capacity, then pulls permits through Town of Corte Madera planning review, factoring flood-zone elevation on bayside lots or fire-resistant roofing and siding on hillside parcels. Inspections are scheduled before the drywall closes. The written scope should spell out allowances for fixtures and counters, a draw schedule tied to inspection sign-off, and a punch list that keeps the final payment contingent on compliance documentation. That structure is what keeps a Corte Madera project on track through the wet season.
Pricing for Home Additions & ADU in Corte Madera, CA
Pricing here reflects the compliance work as much as the build, so a cheap bid that leaves out engineering or fire documentation is not actually cheap. Greenfield development doesn’t exist in Corte Madera, which means every project starts with an existing structure to work around. These are typical estimated ranges for this market; the written estimate sets the final price.
| Project Type | Typical Estimated Range |
|---|---|
| Home Addition | $45,000-$130,000 |
| ADU Construction | $90,000-$220,000 |
| Garage Conversion | $30,000-$80,000 |
What moves a project toward the top of its range: hillside slope and drainage work, flood-zone elevation corrections on bayside lots, second-story structural reinforcement, and premium finish choices like Cambria counters or Kohler fixtures. A second-story addition carries more engineering than a single-story bump-out, and the range reflects that. Estimates are free, and you’ll get a written, itemized quote so you can see exactly what’s included.
We Also Serve Cities Near Corte Madera
The same addition and ADU work we do in Corte Madera carries over to neighboring towns across Marin. Homeowners in Larkspur, Mill Valley, Tamalpais-Homestead Valley, and Tiburon call us for the same combination of structural work and permit navigation. If you’re just outside Corte Madera, reach out and we’ll talk through the specifics for your lot.
Serving Corte Madera, CA – Our Local Coverage Area
We serve Corte Madera and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Corte Madera
Your addition needs to meet the local fire-hardening and flood-zone requirements that apply to your specific parcel, and those requirements should appear as line items in the written quote. Check that the scope names fire-resistant roofing and siding if you’re on a hillside street, and finished-floor elevation compliance if you’re on the bayside flats. A quote that stays vague on compliance is a quote that can grow once work starts. Call (877) 367-8617 for an itemized estimate, free of charge.
A bayside ADU runs on flood-zone rules with close scrutiny of finished-floor elevations, while a hillside ADU answers to wildland-urban-interface fire standards and slope drainage. Same town, different engineering, different materials, different inspections. That’s why the permit package has to be built for your parcel, not copied from a neighbor’s project. Call us to talk through which path your lot follows.
Your contract should spell out the written scope of work, allowances for fixtures and finishes, a draw schedule tied to inspection sign-off, and a punch list that keeps final payment contingent on compliance documentation. Those four items head off most disputes before they start. Call (877) 367-8617 to review a written, itemized estimate.
A permit is what makes the addition legal and insurable, and in a town this rigorous it also protects you at resale. Inspections usually cover foundation and structural framing, rough-in for utilities, and final sign-off before occupancy. Skipping permits here tends to be discovered eventually, and it’s expensive when it is. Call us to start the permit process the right way.
Documented compliance gives your insurer a clear record that the addition meets flood-zone and fire-hardening requirements, which can matter at claim time and sometimes at renewal. Keeping your permits, inspection sign-offs, and compliance records together is the practical step. Call (877) 367-8617 to build that documentation into your project from the start.
Whether you’re planning a second-story addition, a detached ADU, or a garage conversion in Corte Madera, one contractor can take it from structural analysis through final inspection. Estimates are free and always written. Call (877) 367-8617. We answer 24/7. Fast dispatch from 7am to 7pm, Sunday through Friday.
Written by the team at Construction Richmond.